Option 1 – Plumber– Install during installation of a new shower tray or bath


Installation Guide

PDF Download


 

Option 2 – Tiler – Install over a shower tray or bath with an upstandwith an upstand

hydrohalt with upstand shower tray

Installation Guide

PDF Download


 

Option 3 – Tiler – Install into a ledge/wall joint of 2mm or more

install_vid2

Installation Guide

PDF Download


 

Option 4 – Tiler – Install over a shower tray or bath ledge

install_vid2

Installation Guide

PDF Download


 

HydroHALT – How to split a backer rod/cord


 

If the joint between the HydroHALT strip and ledge will not allow a full backer cord, it may be split using a blade and sealant nozzle.


 

HydroHALT – How do trade rolls differ from kit rolls?


 

Trade rolls may be supplied with the adhesive transfer tape temporarily pre-applied adjacent to the strip lower boundary.


 

Liquid Applied Waterproofing Membranes (Summary)


 

We recommend the waterproofing of shower walls with a liquid or mat applied membrane after the installation of HydroHALT.